1 CONSULTING SERVICES HOURLY RATE $0.00 2 Price per square foot (SQFT) to move a portable building within the geographical boundaries of the Garland Independent School District SQFT $0.00 3 Cost to remove and dispose of existing portable skirting per building, as required by the District. Each $0.00 4 Cost per square foot to remove and dispose of existing portable metal awning and decking (including supports, rails, steps, and ramps), as required by the District. SQFT $0.00 5 Cost per block for "additional" blocks (light weight solid load-bearing concrete masonry units) required to set up building at new location, in excess of those removed from the previous location. Each $0.00 6 Additional cost (per building) where "double load" services are involved. "Double Load" is defined as attaching a tractor to a building to remove or place the building as required by the buildings placement, which constitutes a second attachment to the same building. Each $0.00 7 Cost per tie-down strap (service & material) in soil grass Each $0.00 8 Cost per tie-down strap (service & material) in asphalt Each $0.00 9 Cost per tie-down strap (service & material) in concrete Each $0.00 10 Cost per linear foot to remove and replace a part of the existing 4'x6' fence, including posts, when required to remove or relocate a portable building. Linear Foot $0.00