Unit 13 at Desert Pointe Apartments requires a complete interior renovation which includes demolition, framing, drywall, plumbing, electrical and finished carpentry. Demolition • Demo and dispose of existing kitchen and bathroom cabinets and countertops. • Remove garbage disposal, sink, over the range exhaust fan, and properly dispose of. • Remove all appliances and dispose of in an appropriate manner. Recycling whenever possible. • Remove hall closet to make master bathroom shower into a 30" x 60" shower stall. • Remove and dispose of carpet, padding, vinyl flooring, and baseboards throughout the unit. • Remove and dispose of existing doors and door jams to bathrooms and bedrooms. • Remove closet accordion doors. • Demo and dispose of existing shower in master bathroom to studs. • Demo and dispose of tub/shower in bathroom #2 to studs. • Remove and dispose of the lightweight concrete in master and hallway bathroom • Remove wall heater in master bathroom. • Remove all window coverings • Remove existing light fixtures. Electrical • Identify locations and points of connections for recessed lighting in kitchen and hallway. • Samples of proposed recessed lighting fixtures shall be submitted and approved prior to installation. • Install recessed lighting in kitchen and hallway. • Proposed ceiling fan fixture sample shall be submitted and approved prior to installation. • Install ceiling fans in living room and bedrooms.