In Summer 2025, Illinois State University Housing Services will need a contractor or contractors to complete a full interior paint of Hewett Hall during the summer turnover process. Contractor will provide all labor, equipment, and materials (i.e. patching, materials, plaster, primer, finish paint, brushes, rollers, etc.) required to paint all student rooms and residence hall floors noted in schedule. Please refer to the painting schedule attachment. Contractor will submit a bid price for the following: student rooms (defined as any room with a 63”x80” mattress), stairwells (includes stringers, risers and are inclusive of the basement through eighteenth floor), restrooms, hallways (including associated utility room, and all lounges on all floors), Hewett 1st floor lobby, offices, kitchen, hallways, rec room, fitness center and cardio room, elevator doors and elevator frames on each floor, Hewett floors 7-12 suite interior common areas, both suites on 13-17 interior common area, 18th floor, including all hallways and apartments, lobby (includes 1st floor registers), and basement (does not include any side rooms). The north wall of lounges 231-1731 have an accent wall that shall be painted to match as noted in attached drawing for the patching and painting of a room as specified below. All furniture in rooms that will be painted will be removed and replaced by the owner. Owners will also remove dry erase boards from lounges and suites, corner guards and grip-it-strips. All student rooms will be painted on the 2nd-17th floors.