● Designing a system that meets all parameters detailed above and in figure 4 below. ● Procure all necessary components for the system, including galvanized tubing, hardware, brackets and chain link. ● The chain link overhang shall be designed in a way, as to not allow baseballs to get trapped on top. ● The contractor must provide all labor, equipment and installation. ● Protection of the surrounding turf and irrigation system is required, while using heavy equipment during installation. Durable mats or 3/4” plywood may be necessary to distribute weight of large equipment, such as a scissor lift. ● All cleanup and hauling away of un-used materials must be handled by the contractor. ● A pre-bid, self-guided visit at the Down Valley Park is mandatory in order to respond to this RFP. Please contact Greg Pollio (see below) to inform about the site visit. Staff may not be available during your scheduled visit, but we will try to accommodate all requests.