1. Remove and properly dispose of the existing buildings (house, concrete pads, attached garage, attached garage foundation, walkways, paver blocks near rear entry, and possible cistern in the rear yard. Remove all junk, debris, trash, concrete, shrubs, bushes, trees against foundation. In addition: 2. Remove and properly dispose of the driveway from the house to the street. 3. Cap the sewer. Remove any retired/unused sewer piping. 4. Recycle any non-compactible bricks and concrete. 5. Clear lots of all improvements and debris to include removal of all: foundation material, basement walls, concrete slabs, footings, cisterns, porch steps, paver blocks near rear entry, detached garage, detached garage foundation, shed, bushes, shrubs, garbage, refuse and debris. 6. THOROUGHLY MIST OR FOG ALL MATERIALS TO KEEP ADEQUATELY WET DURING DEMOLITION, LOADING, AND HAULING. If temperature is below 32 degrees misting is not required. (Document temperature) 7. Backfill all excavated areas with approved clean clay soil and compact in 12-inch lifts all below grade excavations in an approved method. Preparation, backfilling, and compaction shall be in accordance with Technical Specifications. Provide clean black topsoil on top six inches (6") of all disturbed and excavated areas. Finish grade to match surrounding soil levels, prevent standing water, excessive soil saturation, or erosion, with uniform slopes to provide adequate site drainage.