Work to be performed includes: Lakewood Water District (Owner) desires to drill, construct, and test a new production well at its Scotts Wellfield located in Lakewood, Washington (Figure 1). The project will be contracted and managed by the Owner. Mott MacDonald will be the project geologist (Geologist) and will represent the Owner with the drilling, design, construction, development, and testing of the well. The Owner will provide access to the site prior to mobilization. The Owner shall be responsible for site preparation, disposal of drill cuttings, and water disposal. Drilling water will be provided onsite via a standard garden-hose fitting at one of the nearby well houses. Drilling will be completed using either cable-tool or reverse-circulation mud rotary methods to complete the exploratory drilling to a depth of approximately 600 feet. The selected well drilling contractor (Contractor) shall furnish all labor, equipment, and material necessary to construct and test the new well in accordance with these Specifications. The Contractor will complete either bid Schedule A for cable-tool methods or bid Schedule B for rotary methods.