Specifications include, but are not limited to: Temporary shoring just to the south of grid line H: o Shoring would capture the existing roof-supporting glue-lams in the upper gym and extend down to level one slab in corridor 138 Temporary Shoring at grid line 10: o Shoring could be placed to support the girder at grid line 10 between grid lines B-G. If removal of girder at this grid line is necessary shoring could be placed to the west of grid line 10 from level two floor and up to the roof framing of the weight room, extending to the level one slab to the west of grid line 10 in the gym lobby/entry. o Additional shoring may be needed along grid line 10, southward through the wrestling room and extending to the level one slab in the girls locker room below.