Design services shall include: All design disciplines necessary to complete the scope of work. Attend design kick-off meeting onsite to discuss desired outcome of the project with the Owner, Construction Manager (if applicable), and Owner’s maintenance staff. Evaluation and design for demolition and replacement of an estimated 106,000 SF of EPDM roofing system. Assess removal of all abandoned equipment stands, curbs and pitch pockets. Roof ladder installation as required to meet OSHA Ladder Regulations Section 1910.23 Assess condition of roof drains and recommend replacement. Design for sheet metal coping, counter-flashing, equipment curb flashing, vent stacks, parapet walls, roof edge, conductor heads, gutters, downspouts, scuppers, and associated miscellaneous roofing items where applicable. Core samples and hazardous material testing will be provided and scheduled by the owner. The selected design team shall coordinate the recommended locations of the core samples. Hazardous materials report to be provided by Owner’s LEP.