MCHA is seeking to procure a contractor to remove and replace the bathtub. Scope of work is outlined below. MCHA encourages all MWBE & Section 3 contractors to apply. Base Scope of Work: • Remove existing bathtub and shower walls. Remove damaged insulation on outside walls. Remove old tub drain lines and barrel/drum if present. Dispose of debris. • Auger tub drain before install • On single story buildings with a window located in the tub surround wall, the window will have to be removed, framed and braced to match spacing on existing studs. Cover opening with plywood and vinyl siding to match the color on the unit. The wall sets between two brick covered walls and is less than four feet wide. • Install R-12 (or better) insulation that was removed from the outer surround wall. • Use water resistant (blue or green) drywall. • Finish walls ready for paint. • Exhaust fan will need installed in bathrooms that don’t have one and the window boarded up to match exterior wall design. • Install steel 60” X 30” bathtub