1.01 The Contractor shall provide the County Breathing Air Systems Compressor Parts & Maintenance on an ‘as-needed’ basis at the pay rates as identified in Exhibit C – Mandatory Cost Proposal. 1.02 The Contractor shall provide all labor, tools, equipment, and material necessary for the maintenance and repair of the breathing air equipment. See Attachment A for Fire Rescue Compressors and site locations. 1.03 The following Breathable Air Test shall be performed: a. Quarterly testing shall be conducted by the Contractor’s service technician to meet NFPA 1989 Standard on Breathing Air Quality for Fire and Emergency Services Respiratory Protection. The air quality test shall also be completed when any contamination is suspected. Hall County Fire Rescue will notify the Contractor for any test falling outside the quarterly testing or suspected contamination. b. A certified laboratory that meets N.F.P.A. Section 5-3.6 requirements must perform testing. 1.04 The following Equipment Checks shall be performed: a. Pre-Check: • Owner’s Maintenance Log Inspection • Hour Meter Reading • Oil Pressure Gauge Installed • Air Flow Clearance • Oil Level Check • Drive Belts • Chassis/Cabinet • Engine Oil Level (check) b. Operational Check: • Power on Light • Compressor Rotation • BPMV Function • C.F.M. Output • Oil Pressure, P.S.I. • Oil Flow Visual Check • Condensate Reservoir • Vibration and Noise • Stage Pressures for all Stages • Manual Drain Function • ACDS Function • ACDS Check Valve • ACDS Filters • ACDS Solenoid • ACDS Manual Function • ACDS Purge/Test Switch • Auto Pressure Set • Final Safety Set c. Maintenance Check: • Crankcase Oil Drained • Purifier Chambers Drained • Intake Filter (visual) • Electric CO Monitor • Separator Final (100 hours) • Lube Oil Pump Cam (3-Stage) • Oil Pump Belt/Chain • Cylinder Bolts • Valve Set Screw • Tubing Connections • Head Bolt • Cartridges/Filters Replaced • Crankcase Oil Replaced • Drain Moisture from ASME Tanks • Visual Moisture/CO Monitor • Cascade Tank Dates • Cascade Tank Pressure • Cascade Plumbing Check • Fill Hose Condition • Fill Station Function d. Final Operation and Safety Check: • Compressor Oil Level Check • Securus Test • Final C.F.M. Check • Field CO Test • Air Sample, Kit • Leak Check • Final Hour Meter Reading • Service Date Sticker Placed