Line Number Item Number Quantity Unit Unit Price Extension Price Section 01 COMMON ITEMS 1 020100 1.000 LS CONTRACTOR CONSTRUCTION STAKING / 2 025600 1.000 EACH FIELD OFFICE AND LABORATORY (TYPE A) / 3 012340 1.000 CUYD $40.000 $40.00 FOUNDATION STABILIZATION (SET PRICE) / 4 025323 1.000 LS MOBILIZATION / 5 070626 1.000 LS MOBILIZATION (DBE) / 6 025200 1.000 LS REMOVAL OF EXISTING STRUCTURES / 7 071554 1.000 CUYD $225.000 $225.00 CONCRETE FOR SEAL COURSE (SET PRICE) / 8 040707 1.000 LS CURING ENVIRONMENT / 9 070580 1.000 HOUR $30.000 $30.00 FLAGGER (SET PRICE) / Section 01 Total $295.00 Section 02 ROAD ITEMS 10 025361 1.000 LS CLEARING AND GRUBBING / 11 012410 476.000 CUYD COMMON EXCAVATION (RURAL SMALL) / 12 012415 333.000 CUYD COMMON EXCAVATION (CONTRACTOR FURNISHED) / 13 012420 145.000 CUYD ROCK EXCAVATION / 14 012317 569.000 CUYD COMPACTION OF EARTHWORK (TYPE A) (MR-5-5) / 15 012319 37.000 CUYD COMPACTION OF EARTHWORK (TYPE AA) (MR-5-5) / 16 010114 1.000 MGAL $40.000 $40.00 WATER (GRADING) (SET PRICE) / 17 030189 4095.000 SQYD SALVAGED TOPSOIL / 18 050701 134.000 LNFT CROSS ROAD PIPE ( 24") (RCP) / 19 054601 2.000 EACH END SECTION ( 24") (RC) / 20 023447 425.000 LNFT GUARDRAIL, STEEL PLATE / 21 023456 556.250 LNFT GUARDRAIL, STEEL PLATE (MGS) /22 012711 4.000 EACH FLUME INLET (CONCRETE) / 23 012281 188.000 LNFT SLOPE DRAIN (STONE) / 24 025007 1.000 EACH $200.000 $200.00 TOWING (COURTESY) (SET PRICE) / Section 02 Total $240.00 Section 03 AA1 GUARDRAIL END TERMINAL ALT (MGS-SRT) 25 030566 4.000 EACH GUARDRAIL END TERMINAL (MGS-SRT) / Section 03 Total Section 04 AA2 GUARDRAIL END TERMINAL ALT (MGS-FLEAT) 26 030567 4.000 EACH GUARDRAIL END TERMINAL (MGS-FLEAT) / Section 04 Total Section 05 BB1 GUARDRAIL END TERMINAL ALT (SRT) 27 023448 2.000 EACH GUARDRAIL END TERMINAL (SRT) / Section 05 Total Section 06 BB2 GUARDRAIL END TERMINAL ALT (FLEAT) 28 023410 2.000 EACH GUARDRAIL END TERMINAL (FLEAT) / Section 06 Total Section 07 TEMP PRJ WTR POL CTL-SOIL EROSION 29 072223 15.000 LBS. TEMPORARY FERTILIZER (16-20- 0) / 30 030537 11.000 LBS. SOIL EROSION MIX / 31 072285 1708.000 SQYD EROSION CONTROL (CLASS 1) (TYPE C) / 32 071291 1.000 CUYD $50.000 $50.00 SEDIMENT REMOVAL (SET PRICE) / 33 072400 1.000 LNFT $2.000 $2.00 TEMPORARY BERM (SET PRICE) / 34 072411 1114.000 SQYD GEOTEXTILE (EROSION CONTROL) / 35 010123 1.000 MGAL $40.000 $40.00 WATER (EROSION CONTROL) (SET PRICE) / Section 07 Total $92.00 Section 08 BR NO 70-31-298.98 (095) 36 012402 240.000 CUYD CLASS III EXCAVATION / 37 010337 161.000 LNFT CORE HOLE (INVESTIGATIVE) / 38 032813 350.000 CUYD CONCRETE (GRADE 4.0) (AE) (SA) / 39 072350 226.000 CUYD CONCRETE (GRADE 4.0) (AE) / 40 025103 87930.000 LBS. REINFORCING STEEL (GRADE 60) (EPOXY COATED) / 41 025100 39000.000 LBS. REINFORCING STEEL (GRADE 60) / 42 072024 170113.000 LBS. STRUCTURAL STEEL (M270) (GR 50WT3) / 43 025135 23720.000 LBS. STRUCTURAL STEEL (A709) (GR 50W) / 44 025134 1062.000 LBS. STRUCTURAL STEEL (A709) (GR 50) / 45 070869 15.000 EACH BEARING (STEEL REINFORCED ELASTOMERIC) / 46 025110 4740.000 EACH WELDED STUD SHEAR CONNECTORS / 47 013333 882.000 SQYD BRIDGE DECK GROOVING / 48 014070 637.000 LNFT PILES (STEEL) (HP12X53) / 49 070258 417.000 LNFT DRILLED SHAFT ( 48") (CASED) / 50 072216 1.000 EACH $2,000.000 $2,000.00 SONIC TEST (DRILLED SHAFT) (SET PRICE) / 51 071021 74.000 SQYD BRIDGE BACKWALL PROTECTION SYSTEM / 52 014018 90.000 CUYD ABUTMENT AGGREGATE DRAIN / 53 070970 482.000 CUYD SLOPE PROTECTION (AGGREGATE) / 54 010300 1.000 LS FALSEWORK INSPECTION / 55 014094 14.000 EACHf