A. The work will be done under one prime contract that includes: General, Mechanical, Electrical, and Plumbing construction. B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1. The total project includes the renovation of the existing 4th floor tentant space of the Department of Revenue in the Stassen building on the Capitol Complex. a. Demolition as required for trade work (e.g. mechanical/electrical). b. Minor new construction of architectural walls. c. Repair/Replacement of existing ceiling grid and additional ceiling acoustic insulation. d. New entryway storefront. e. Modification of existing plumbing, including new fixtures. f. Modification and new construction of electrical –including providing connections for Demountable Walls and Furniture, low voltage conduit pathways / rough-ins. g. Modification and new construction of mechanical systems. h. Modification and new construction of fire suppression systems and controls. i. Relocation of existing light fixtures and new fixtures as applicable. j. Limited relocation of existing HVAC thermostats and security card readers. k. Prepare for and coordinate other work work scopes outside of this contract, including new demountable partition walls, furniture, and AV technology. l. Coordinate with separate carpet, lighting and painting projects by Owner.