1. Secure the perimeter following International Building Code. Install erosion control measurements around jobsite. 2. All the building structures including but not limited to floor slabs, drains, lifts, concrete footpaths, septic tanks (if any), debris, drums, containers, used ASTSs, signs, junk and trash removal, tree & shrubs and other components inside and outside the main building must be completely demolished and removed from their present site. Ashpalt parking area to not be demolished (no asphalt/driveway/sidewalk demolition). 3. Disturbed area must be graded, backfilled & compacted, sloped in such a manner that the site does not retain water (around 1% grade). Seed and Straw must be applied after site disturbance. 4. Once demolition is completed, Contractor should place concrete bin blocks at driveways. 5. All demolition debris must be removed and disposed of properly in an appropriate landfill or recycled in accordance with the provisions of the Georgia Comprehensive Solid Waste Management Act of 1990 and the Georgia Rules for Solid Waste Management Chapter 391-3-4. 6. See additional information in the Appendix (Site Plan, Asbestos & Lead Paint Inspection Report, Phase I and II Environmental Site Assessment).