Primary Tank Replace two (2) high head pumps (240v 50 gpm rate) within 6,000 gallon primary tank of Advantex AX20 Textile Treatment System Replace four (4) floats within 6,000 gallon primary tank of Advantex AX20 Textile Treatment System Repair wiring and make watertight connections within 6,000 gallon primary tank of Advantex AX20 Textile Treatment System Replace PVC Check valve relief and piping Use hose attached to vacuum truck to pump out approximately 6,000 gallons of septic waste (liquid and solid) from the primary tank of the system Use hydro-jet to break up solid waste for disposal and to discharge lines, as needed. Transport containerized, waste to approved treatment, storage, and disposal facility (TSDF) Provide Department with copy of non-hazardous or hazardous waste manifest (whichever is applicable) Work can only take place Monday through Friday from 7am to 4pm, so as to minimize interruption to the public. All work shall be coordinated with DBH contract administrator before the project begins. Recirculation Tank Replace two (2) high head pumps (240v 50 gpm rate) within recirculation tank of Advantex AX20 Textile Treatment System Replace four (4) floats within recirculation tank of Advantex AX20 Textile Treatment System Repair wiring and make watertight connections within recirculation tank of Advantex AX20 Textile Treatment System Replace PVC Check valve relief and piping Dosing Tank Replace two (2) high head pumps (240v 30 gpm rate) within dosing tank of Advantex AX20 Textile Treatment System Replace four (4) floats within dosing tank of Advantex AX20 Textile Treatment System Repair wiring and make watertight connections within dosing tank of Advantex AX20 Textile Treatment System Replace PVC Check valve relief and piping