San Miguel Pump Station • Install new soft starters, circuit breakers, fuse blocks, transformer(s) for control power and fuses in existing MCC. • Install new main wire from bus bars to motors. SCADA • Install new panel with PLC and cards. • Install sensors and meters. • Do all control wiring • Provide program in PLC to ensure proper operation and connection to wells 9&10. Wells 9&10 • Install new VFD’s, circuit breakers, fuse blocks, transformer(s) for control power and fuses in existing MCC. • Install new main wire from bus to VFD’s SCADA • Install new PLC and cards. • Do all control wiring • Hook up existing meters and level sensors to PLC • Provide program in PLC to ensure proper operation and connection to wells 9&10.