The 2025 PCC Street Patching Program project includes the full depth removal and replacement of PCC street pavement at six (6) separate locations, generally located on: Site 1 – NW Prairie Ridge Dr between NW State St and NW Ash Dr, Site 2 – Fire Station #1, Site 3 - E First St between N Ankeny Blvd and NE Delaware Ave, Site 4 – SW Ordnance Rd between SW State St and SW Westview Dr, Site 5 – SE Magazine Rd between S Ankeny Blvd and SE Delaware Ave, Site 6 – SW Glenbrooke Blvd between SW Fox Run Dr and SW Sunnybrooke Dr, and SW Meadow Ridge Dr between SW Fox Run Dr and SW Sunnybrooke Dr The construction improvements include approximately 1,000 SY of 9” thick PCC Class C-SUD full depth patches, 2,300 SY of 8” thick PCC Class C-SUD full depth patches, and 700 SY of 7” thick PCC Class C-SUD street pavement. Other associated improvements include sidewalk and pedestrian ramp removal and replacement, installation of new intake structure, minor adjustments to storm sewer structures, partial rebuild of an existing intake, temporary traffic control, maintenance of postal service and solid waste collection, temporary surface restoration, mobilization, and miscellaneous associated work necessary to complete the project. A truss screed shall be utilized on all patches greater than or equal to three panels in length.