Due to the various project components, this project may consist of multiple design and construction packages to optimize the delivery. At a minimum the project work may include but not be limited to: A passenger check-in / baggage check operation remote from the Terminal 3 Check-In Lobby to ease demand Transformation of the Terminal 3 Check-In Lobby to assist airline operations and improve passenger processing Reconfiguration of equipment and space at Explosive Detection System to provide Outof-Gauge Baggage Screening and expand Checked Baggage Reconciliation Area buffer Relocation and expansion of outbound baggage handling system manual encode station Addition of outbound baggage make-up carousels along with associated facility enclosure modifications, conveyors and controls at the North and South Concourses Modification of the inbound baggage handling system to provide induction pier with associated conveyors / controls and extend two claim carousels Transition baggage handling system controls to Ethernet Protocol Addition of new passenger security screening checkpoint lanes