Mobilization/Demobilization; Traffic Control, Safety and Cleanup; Construction Staking and Monument Perpetuation; Storm Water Best Management Practices (BMPs); Crack Sealing; Unclassified Excavation and Disposal, Construct Rubberized AC pavement Overlay, Cold mill and Dispose of Existing Asphalt; Remove and Dispose of Existing Asphalt; Construct Concrete Curb and Gutter, and Driveways over CMB with AC Slot Trench; Sawcut and Remove Sidewalk and Ramp and Construct Curb Ramp with Detectable Warning Surface; Traffic Striping, Crosswalks, Curb Painting, Markings, and Raised Pavement Markers; Traffic Signal Loop Detectors; Adjust to Grade Valves, Manhole Covers; Pull Boxes, and Water Meter Boxes; Coordinate with Utilities for Adjust to Grade by Others; Grind Tree Roots; and all incidental work so indicated on the specifications, and required for the proposed improvements.