The work generally consists of, but is not limited to, upgrades at the existing Straightway Water Treatment Facility and Site, including a new 11,000 ft2 municipal water treatment facility with greensand filtration, granular activated carbon (GAC) contactors, advanced oxidation using hydrogen peroxide and ultraviolet (UV) reactors, and chemical feed systems. The work also includes a new 2,300 ft2 building to be constructed around existing outdoor GAC contactors, two new municipal drinking water wells and associated pump stations, modifications to the existing booster pump station, modifications to the existing Straightway Treatment Facility, site work and exterior piping systems, stormwater management features, selective demolition within existing facilities, and complete demolition of the existing Simmons Pond and Hyannisport Facilities. The work includes two bid alternates. The Owner may choose, at their option, to include the alternates as outlined in Specification Sections 00301, 00302A through 00302H, and 01025 in the order provided.