The bridge clear span is expected to be approximately 100’ long. The project will also include an ADA compliant trail/sidewalk connection to the bridge from the A. Keith McDonald Pavilion. Future projects will provide paved access to the south side of the bridge. The City desires a prefabricated pedestrian truss bridge with a 10’ clear walkway width. The bridge structure and its foundations are to be designed from steel and reinforced concrete and shall include lowmaintenance materials, including but not limited to weathering steel, concrete deck, galvanized/stainless steel hardware, precast concrete, and high-performance cast-in-place concrete. Use of wood materials as a primary design component is prohibited. Items anticipated in the scope of this project include but are not limited to, the following: project planning/scoping, survey, geotechnical, hydraulics & hydrology, environmental compliance, and detailed design.