Removal and reconstruction of approximately 80 curb ramps at certain locations in the City. Construction of an accessible path at Cypress and Pine Park. The improvements will be constructed in accordance with 2010 Americans with Disabilities Act Standards, and Public Right of Way Accessible Guidelines. The work consists of, but is not limited to: 1. Construct, maintain, and remove temporary work zone traffic control measures. 2. Construct, maintain, and remove erosion control measures. 3. Perform all removal of structures and obstruction, clearing and grubbing, and earthwork operations. 4. Place pavement markings and striping. 5. Install signing 6. Construct roadway improvements including aggregate base, ACP wearing surfaces, concrete curb and sidewalks. 7. Roadside development including grading, seeding, and planting.