Approximately 8 SqYd of Asphalt Pavement Removal (4" Nominal Depth), 550 CuYd of Unclassified Excavation, 60 CuYd of Disposal of Excess Material, 290 CuYd of Aggregate Base Course, 140 Ton of Asphalt Base / Surface Course, 9 Ton of Asphalt Binder (PG 64-34), 1 Ton of Emulsified Asphalt Prime Coat, 60 SqYd of Concrete Valley Gutter, 150 Ft of 10' Chain Link Fence, 1 Each of Install Salvaged 20' Cantilever Roll Gate, 0.3 Acre of Seeding and Fertilizing, 140 CuYd of Topsoil (Removed from Stockpile), 1460 SqYd of Mulching, 630 SqYd of Geotextile Separator Fabric, 330 Ft of Remove and Dispose of 10' Chain Link Fence, 1 Each of Remove and Salvage Existing 20' Cantilever Roll Gate, 620 SqYd of Remove and Salvage Existing Gravel Surfacing (6" Nominal Depth), 1 Each of Sanitary Sewer Manhole Adjustment, 1 Each of Sanitary Sewer Cleanout Adjustment, 320 SqYd of Place Salvaged Gravel Surfacing 320 Ft of High Flow Silt Fence, Pavement Marking, and other items of related construction.