1 C-102 Temporary Seeding and Mulching 1 LS 2 C-102 Installation and Removal of Silt Fence 1,415 LF 3 C-102 Installation and Removal of Wattle Barrier 520 LF 4 C-102 Preparation of SWPPP and Obtaining NOI 1 LS 5 C-105 Mobilization (N.T.E. 10%) 1 LS 6 P-101 Marking Removal 160 SF 7 P-152 Unclassified Excavation (Established Quantity) 3,093 CY 8 P-152 Muck Excavation 400 CY 9 P-620 Permanent Pavement Marking with Reflective Media 290 SF 10 P-620 Permanent Pavement Marking without Reflective Media 579 SF 11 F-162 8' Chain-Link Fence with 3-Stranded Barb Wire Extension 138 LF 12 F-162 4' Wide Chain-Link Walk Gate 2 EA 13 D-701 18" Class III Reinforced Concrete Pipe (RCP) 72 LF 14 D-701 18" Class III RCP Flared End Section 2 EA 15 D-701 30" Class III Reinforced Concrete Pipe (RCP) 64 LF 16 D-701 30" Class III RCP Flared End Section 2 EA 17 D-701 36" RCP Flared End Section Removal 1 EA 18 D-701 36" Class III Reinforced Concrete Pipe (RCP) 22 LF 19 D-701 36" Class III RCP Flared End Section 1 EA 20 T-901 Seeding 1 LS