Allegany College of Maryland is securing quotes to install a Homeplate halo on the baseball field. Interested parties should provide a quote for this project based on the specifications below: 1. Layout the area to include new 5’ wide halo around home plate 8’ away from halo; 2. Excavate area of halo to a depth of 8” to accept stone base and concrete; 3. Set halo elevation for concrete contractor (separate vendor); 4. After concrete is installed by others, re-mobilize; 5. Supply and Install halo provided by OnDeck Sports (or equivalent vendor) by gluing halo to concrete. Design of the halo logo is attached. 6. Precision grade area outside of halo; 7. Install 1,200 sq. ft of Big Roll Kentucky Bluegrass sod; 8. Touch up/add infield mix to home plate area; 9. Perform a clean-up of the area