1. The Successful Bidder shall perform carpentry services including but not limited to: a. Gypsum Board Installation: The Successful Bidder(s) shall i. Provide work conforming to published specifications and installation instructions of each manufacturer, the approved shop drawings, above-referenced quality assurance standards, the governing laws and code. Refer to drawings to determine location of fire -resistive, fire-protective, and acoustically rated work, and construct this work to conform to the specifications and installation instructions of UL or other testing agency (IES). Also refer to the drawings for individual task order, if applicable, to determine the number of layers of gypsum board, thickness of board, etc., for each of the installations. ii. Erect gypsum drywall work, rigidly supported, and securely fastened in place, in such a manner that plumb, level, and true finished lines and surfaces will result in the finished work in accordance with the requirements of AST C 754 and AST C 840. iii. Construct gypsum drywall work only after all windows and door openings are enclosed and a temperature of not less than 550f. is maintained during and up to completion of the drywall work. b. Boardwalk Decking: The Successful Bidder(s) shall i. Provide all temporary guying and bracing required to erect and hold the structure in proper alignment until all structural members are secured in place. ii. Verify the requirements of other trades as to sleeves, hangers, anchor holes, etc. to be placed or set in the structural work iii. All wood framing materials shall be southern pine, surfaced dry and used at 19% max. moisture content or equals. As follows: 1) Stringers No.1 2) All others No. 2 iv. All wood framing materials shall be treated in accordance with the requirements of AWPA-C1 and C2. Treat members below decking as specified for members subject to marine borer exposure. v. All nailing not otherwise indicated shall be in accordance with the BOCA building code current edition. vi. Contractor to provide solid bridging for all stringers. Max. spacing shall be 8’-0” O.C. unless otherwise noted. vii. Bolts connecting wood members shall be A.S.T.M. A-307 common steel bolts and shall be of the size indicated on the plans. Ogee washers shall be used under each bolt head and nut. Bolt head shall be facing out and nuts shall be under pier and docks. viii. All steel shall be galvanized by the hot-dip process in accordance with the A.S.T.M. A-123 or A153 as applicable. ix. Stringers to be spliced over pile caps only. x. 1/8” spacing required between 2”x6” deck boards. c. Carpentry: The Successful Bidder(s) shall: i. Fabricate, erect, install and repair structures, structural members and fixtures made of wood, plywood, wallboard, and materials that take the place of wood, such as plastic, metals, composites, fiberglass and transite sheeting and Cemesto board. ii. Layout, construct and install footings, floors, walls, roofs, doors, windows, stairways, etc. iii. Furnish and use all types of scaffolding, staging, etc., as necessary. iv. Repair and replace doors, walls, ceilings, window frames, sashes, stairs, handrails, casework, etc. v. Frame stud wall. vi. Install sheet metal siding, vinyl siding, or lap cementitious siding. vii. Repair and replace building structure, i.e., studs, joists, trusses, rafters, beams, etc. viii. Modify existing, fabricate new or relocate existing wood framed room partitions, permanent or temporary in nature. ix. Install interior and exterior trim and other related finish work, i.e., window and door trim, baseboard, chair rail, cornice, etc. x. Install and maintain all types of hardware, i.e., window and door locks, hinges, etc. xi. Install casework/cabinetry. xii. Caulking, sealing, weatherproofing and all other protective barrier applications. xiii. Ceiling and wall insulation replacement or addition.