Specifications include, but are not limited to: The Work consists of the relocation of an existing 30- to 36-inch concrete storm drain from easement to street right-of-way. Work consists of the removal of the entirety of the existing storm drain system in street right-of-way and abandonment of approximately 550 linear feet of 30- to 36-inch existing storm drain within easement via filling the pipe with Controlled Low Strength Material (CLSM). The new storm drain system consists of eight new curb inlets, approximately 1,160 linear feet of 18- to 36-inch reinforced-concrete-pipe storm drain, and associated concrete headwall, junction box, and manholes. The work also consists of the relocation of approximately 1,230 linear feet of 6- to 8-inch sewer main and associated manholes, and wastewater services, and the relocation of approximately 400 linear feet of 6- to 8-inch water main and associated water services.