Shared-Use path connecting existing pathway at River Prairie Drive north to existing pathway at STH 312 ? Survey services ? Geotechnical Services – 6 borings @ 10’ depth (retaining wall and fill locations) ? Section 106 ? Preliminary and final design services ? 30%, 60%, & 90% plan design ? Storm water layout and design options to meet drainage needs (raise pathway to drain, area inlets, drain tile where needed) ? Retaining walls are expected in three locations along project limits ? Real Estate Services – Title searches and TLE’s will be needed along project limits for temporary grading needs. All improvements need to be made with in the existing right of way. ? TPP for TLE and fee for pedestrian ramps where needed ? Utility Coordination ? Preliminary and final engineers estimate