The project consists of furnishing, installing and providing all labor and materials required for approximately 190,000 square yards of hot-in-place asphalt recycling, edge milling, full depth HMAC repair, adjustment of water valves and manholes, tree pruning, traffic control, and miscellaneous striping. The Contractor shall take precautions to prevent injury to the public due to open trenches. Night watchmen may be required where special hazards exist, or police protection provided for traffic while work is in progress. The Contractor shall be fully responsible for damage or injuries whether or not police protection has been provided. The Contractor shall observe the rules and regulations of the State of Texas and agencies of the U.S. Government prohibiting the pollution of any lake, stream, river, or wetland by the dumping of any refuse, rubbish, dredge material, or debris therein.