Construction and completion at two adjacent locations of approximately 550 LF of new 6- inch SDR sewer main by trenching within Thompson Way, 135 LF of new 6-inch SDR by trenching on Sherman Street, 10 sewer lateral connections, 5 new sewer cleanouts, 4 48- inch sewer manholes, 2 connections into existing manholes, 3 new 1-inch poly-tube water services by hot-tap, abandonment of existing 6-inch sewer main and a 4-inch water main, SD point repairs, 50 LF of new 12-inch RCP SD pipe on Thompson Way, 65 LF of 8-inch SD Pipe on Sherman Street, 4 new SD DIs, removal and abandonment of 8 and 12-inch SD pipe, 70 LF of C&G, 254 LF of 12-inch CIPP SD pipe lining, reestablishing 30 LF of drainage ditch and regrading of 3,900 SF of roadway. Work includes, but is not limited to: soil excavation, rock excavation, backfilling and compaction, concrete, pipefitting, pipe abandonment, manhole removal and replacement, connections to existing City facilities, site restoration, roadway grading, patch paving and trench paving, sewer bypass pumping, traffic control, and all other work required in the Contract drawings. The contractor shall be Class “A” licensed.