The Town of Sullivan’s Island proposes to complete the design and implementation of the stormwater drainage outfalls improvement at Station 18.5 Street and Station 25 Street because of high-volume coastal flooding and rainfall events. The Town will complete Phase 1 of the project, which consist of the non-construction activities necessary to plan, survey, engineer, design, and permit the proposed project. The final design deliverables must have the highest level of credibility based upon data-driven, expert analysis. Therefore, the Town seeks an experienced firm that is familiar with these types of projects and can work within the intent of the program. The selected firm will provide comprehensive data analysis and design which will stand intense public scrutiny