Specifications include, but are not limited to: This project consists of the preparation and lining of approximately 15,400 LF of corrugated metal pipe (CMP) storm sewers ranging in size from 12-inch to 60-inch diameter, the replacement of approximately 100 LF of 12¬ inch diameter CMP storm sewer, and the replacement of about 90 storm sewer structures. The project also includes other items incidental to the storm sewer cured-in-place pipe lining and infrastructure replacement, including opening storm sewer structures/access points, dewatering, storm sewer flow control, management and disposal of materials removed from the storm sewers, maintenance of traffic, and restoration of disturbed areas including sidewalk, curb, and gutter, and pavement. The work includes the carrying out of all duties and obligations and the furnishing of all labor, material, tools, equipment, and other incidentals necessary or convenient to the successful completion of the project.