USCGC RESOLUTE Hull and Propellor Cleaning
Scope:
Contractor shall:
- Remove all growth and sea life from the underside of CGC Resolute, to include the hull and shafts
- Remove all line or impedances from the propellor and shaft
- Retain as much of the existing anti-fouling as possible
- Power wash all sea chest suction inlets
- Polish both propellors
Resolute is 200 ft long at the waterline, has a 34 ft beam, and drafts approximately 10 feet. Actual amount of growth is unknown.
Commencement, Prosecution and Completion of Work:
Address: 5 C. La Puntilla, San Juan, 00901, Puerto Rico. Work shall commence on 14 September 2024. All equipment shall be supplied by the contractor. The point of contact for all work is LT Joe Rizzardi (703) 943-0590.