1. Pre-Installation and Construction Services a. Finalized Design of systems and Work required to be installed and constructed and submitted as a required submittal for approval. b. Prepare and submit final shop drawings for review and approval. Prepare and submit technical data, reports, equipment, and material cut sheets, etc. c. Prepare Plans and Technical Specifications for submittal to issue of Work Permit from the Town of Warwick Building Department. 2. Passenger Boarding Bridge (PBB) a. Refurbished (3) three tunnel passenger boarding bridge. [Additive Alternate No. 1: New (3) three tunnel passenger boarding bridge] b. Refurbished Fixed walkway passenger boarding bridge sections. [Additive Alternate No. 2: New fixed walkway passenger boarding bridge sections] c. New Bridge mounted pre-conditioned air unit. d. New Bridge mounted 400 Hz ground power unit. e. Baggage slide. 3. Terminal Building Modifications and Related Improvements a. Selective demolition. b. Cutting and patching. c. Modifications to the exterior curtain wall system. d. Modifications to the terminal building fin tube heating system. e. Electrical improvements to support the new passenger boarding bridge, and related items. f. Access security control electrical raceways and back boxes. g. Exterior Gate signing. h. Passenger boarding bridge support pedestal and foundation systems.