Specifications include, but are not limited to: This project is for the reconstruction of the existing Prospect Heights sanitary sewerage system to remove the siphon under the existing drainage on Beverage Hill Avenue and replace it with a gravity sewer main and relocation of the existing drainage system along Beverage Hill Avenue from approximately Notre Dame Avenue to the intersection of Beverage Hill Avenue/Prospect Street/Fortin Avenue in Pawtucket, RI. This project is intended to reconstruct the existing 24-inch sewer pipe connecting the Prospect Heights housing development to the The City of Pawtucket sewer system within Beverage Hill Avenue. Currently, the housing development sewer pipe is routed underneath an existing 60-inch drain pipe under Beverage Hill Avenue, acting as a siphon. This siphon caused regular back up of sewage flows and requires frequent jetting. The sewer is proposed to be reconstructed to a gravity sewer to prevent back-ups caused by the siphon. The project is being funded by Rhode Island Infrastructure Bank (RIIB) under the Clean Water State Revolving Fund (CWSRF). All permitting shall be in accordance with Federal, municipal and state standards.