• ROOF AND END MATERIAL – (1) 48’ long, Heavy-Duty, HDPE, Non-FR, white fabric roof cover and (2) 42’ wide Heavy-Duty, HDPE, Non-FR, white fabric end panels. • ADDITIONAL MISC. NEW MATERIALS – 6’ no-sew wind-straps, PVC tensioning pipes, tensioning ratchets, cam buckles, bonnet flap cables, box winches with wedge anchors, steel tensioning tubes for the front-end wall, PT termination boards, tap-cons and termination screws. (the termination flat bar will be re-used as it is in good condition). • REMOVAL AND INSTALLATION – The old fabric that is on the building will be unterminated and removed. The site/building will be prepped, and new PT termination boards will be installed. The new roof and the (2) new ends will be installed. The fabric will be professional terminated. The contractor is responsible for all waste removal and site cleanup. • DELIVERY – SCDOT will offload and accept delivery of the materials with a detailed bill of lading. • PREPARATION - SCDOT will have the area around the salt shed free of any obstacles/material, debris etc. prior to work beginning.