The Project includes the following Work: Base Bid Two test wells (including water sampling) and two municipal groundwater production wells - each approximately 700’ deep with 400-gpm vertical turbine pump, 24” outer carbon steel casing, 16” inner stainless-steel casing, 8” inner stainless-steel casing, and 8” stainless-steel screen. Water treatment facility consisting of a 24’x30’ one-story prefabricated precast concrete building on concrete foundation with four rooms (controls/electrical, caustic soda equipment, caustic soda storage, and sodium hypochlorite equipment/storage), electrical, HVAC, plumbing, instruments, controls, and telemetry (SCADA). 6” DIP, valves, fittings, and appurtenances for well site plumbing and connection to existing water system, post hydrant, electric generator (diesel), clearing, grading, gravel driveway, asphalt driveway, storm drainage, concrete slabs for wells, and fencing. Bid Alternate 1 Abandon off-site existing Well No. 2 (10” casing, 295’ deep) and disconnect existing WTP No. 1 from water distribution system. Bid Alternate 2 Abandon off-site existing Well No. 3 (8” casing, 310’ deep) and disconnect existing WTP No. 2 from water distribution system.