009E0010 Mobilization Lump Sum LS; 110E1010 Remove Asphalt Concrete Pavement 1,667.0 SqYd; 110E1690 Remove Sediment 10.0 CuYd; 120E0010 Unclassified Excavation 2,952 CuYd; 120E0900 Contaminated Material Excavation 100 CuYd; 230E0010 Placing Topsoil 672 CuYd; 260E1010 Base Course 1,600.2 Ton; * 320E1200 Asphalt Concrete Composite 558.7 Ton; 630E1010 Straight Class A W Beam Guardrail with Wood Posts 25.0 Ft; 630E1140 Straight Double Class A W Beam Guardrail with Wood Posts 43.8 Ft; 630E2015 W Beam Guardrail Flared End Terminal 4 Each; 632E2220 Guardrail Delineator 16 Each; 633E1220 High Build Waterborne Pavement Marking Paint, 4" White 1,200 Ft; 633E1222 High Build Waterborne Pavement Marking Paint, 4" Yellow 150 Ft; 634E0110 Traffic Control Signs 207.5 SqFt; 634E0120 Traffic Control, Miscellaneous Lump Sum LS; 634E0275 Type 3 Barricade 8 Each; 734E0010 Erosion Control Lump Sum LS; 734E0102 Type 2 Erosion Control Blanket 765 SqYd; 734E0154 12" Diameter Erosion Control Wattle 780 Ft; 734E0165 Remove and Reset Erosion Control Wattle 95 Ft...