502-02 HOLES 5.000 EACH; 502-03.25 FULL DEPTH PCC PAVEMENT REPAIR HIGH EARLY 1,750.000 C.Y.; 502-03.26 PARTIAL DEPTH PCC PAVEMENT REPAIR HIGH EARLY 50.000 S.Y.; 502-04.01 SAWING CONCRETE PAVEMENT (FULL DEPTH) 7,500.000 L.F.; 502-04.02 LOAD TRANSFER DOWELS 3,000.000 EACH; 502-04.03 TRANSVERSE TIE-BARS 600.000 EACH; 502-08 PRE-ROLLING 50.000 S.Y.; 502-08.02 RESEALING JOINTS (SILICONE SEALANT) 1,300.000 L.F.; 502-08.03 SEALING SHOULDER JOINTS 1,800.000 L.F.; 502-08.07 SEALING RANDOM CRACKS (SILICONE SEALANT) 250.000 L.F.; 502-10 CEMENT-FLY ASH GROUT 50.000 C.F.; 503-01 GRINDING CONCRETE PAVEMENT 400.000 S.Y.; 503-60 RETROFIT DOWEL BAR 25.000 EACH; 712-01 TRAFFIC CONTROL (1) LS; 712-01.02 LANE CLOSURE 8.000 EACH; 712-01.03 LANE CLOSURE(NIGHT WORK) 6.000 EACH...