Specifications include, but are not limited to: A. ASBESTOS REPORTING UNITS (ARU’S): As required by the Texas Department of State Health Services, Regulated Asbestos Containing Materials (RACM) must pay a fee based on the quantity of RACM material removed. The City of Wichita Falls will be responsible for payment of this fee. DO NOT INCLUDE IN BID PRICE. The City of Wichita Falls has hired Flint Inspection and Consulting Services Inc. to provide air monitoring during the asbestos abatement of the building. Asbestos abatement is being bid separately (Bid # B2300005) and will be completed prior to demolition. DO NOT INCLUDE IN BID PRICE. B. DISPOSAL FEE. Landfill fees shall be paid by the Contractor at time of debris disposal. These fees shall be included in the bid price. ALL debris (unless other approval is received for recycling purposes) shall be taken to the City of Wichita Falls Landfill located at 10984 Wiley Rd, Wichita Falls, Texas 76307. If the debris is unable to be taken to the CWF Landfill prior approval must be received prior to taking the debris to another location. City of Wichita Falls landfill tickets shall be submitted with invoice once the demolition is complete. Failure to submit City of Wichita Falls landfill tickets may result in City retaining a dollar amount equal to disposal fee costs based on estimated project tonnage. Any outstanding invoices to the Landfill shall be paid before contractor will receive final payment for awarded demolitions. NOTE: Vehicle tires are to be taken to the landfill or taken to the Wichita Falls Transfer Station. Costs for disposal shall be included in bid amount. C. PERMITS: It is the Contractors responsibility to obtain and pay for all permits and comply with all requirements of local, State and Federal laws, and assure that no legal requirement has been or will be violated in making or accepting this bid. Permits are issued by the City of Wichita Falls at the cost of the contractor. Note: Permits must be obtained for demolition from Building Inspection, Room 401, Memorial Auditorium, 1300 7th Street, Wichita Falls, TX, 76301 Phone: (940) 761-7459. ** Disconnection and capping of the sewer lines will be the responsibility of the contractor. The work must be completed by a licensed plumbing contractor and will need to be disconnected at the property line. The plumbing permit will be included with the demo permit. The work must be inspected upon completion. Please call Building Inspections at the number above to schedule the inspection. D. TREES AND FENCE: Contractor shall be required to remove any dead trees on the property and only those live trees that prohibit demolition activity, or as indicated on the individual property schematic. E. EMISSIONS CONTROL: Awarded contractor named herein is required to furnish water truck(s), hoses, and related hardware necessary to provide control of dust and particle emissions during all demolition and debris removal. Obtaining water and the cost of the water will be the responsibility of the awarded contractor. All contractor furnished equipment, pumps, hoses and all related hardware shall meet standards of acceptance by City Plumbing Inspection and Public Works personnel. Water availability will be the nearest fire hydrant at each demolition location. City water may not be expended by contractor personnel from any fire hydrant prior to the placement of a meter. Coordination and location of meters shall be the responsibility of the awarded contractor. Installation of the meter will be accomplished by the Public Utilities Department, Telephone (940) 761-7411. Note: a twenty-four-(24) hour notice is required when re-location of a meter is required. **During drought restrictions water meters may not be available through hydrant meters, it is the responsibility of the contractor to locate and obtain water from another source