Specifications include, but are not limited to: Coordinate with ESC2 Facility Services Manager and Office of Information Technology delivery, demolition, installation and startup Current Thermal Management System Unit must remain in service during the new Thermal Management System Installation Provide rooftop mounting structure for new condensing unit Coordinate membrane installation and modifications with roofer – Certified Building Products Remove existing air handling unit above IT server hardware in conditioned space Reclaim refrigerant from air handling unit above ceiling Dispose / recycle removed unit Condensation drain line designed to run to condensation pump terminating into sanitary sewer Remove existing chilled water lines and remove from immediately above the IT server system Return current suspended ceiling pads, grid and lighting after completion Protect server equipment and maintain current cooling for facility operation Provide new power source to new air handling unit Provide new power source to new condensing unit Provide power feed to equipment from electrical closet 480 /3 phase Coordinate electrical installation and modifications with electrician Five-year compressor warranty – manufacturer’s Factory / manufacturer’s equipment startup