Scope: Prepare a Master Plan 1. Prepare a Master Plan consistent with the most current FAA Advisory Circulars and Standard Operating Procedures, to include incorporating sustainability and recycling, reuse, and waste reduction; 2. Incorporate FAA AGIS requirements and data collection as needed, including an -18B obstruction survey, and upload data to the FAA’s Airport Data and Information Portal. 3. The ALP will include the following sheets: a. Coversheet b. Airport layout drawing c. Data sheet d. Terminal area plan e. Airport airspace drawing f. Inner portion of the approach surface drawing g. On-airport land use drawing h. Off-airport land use drawing i. Airport property map (Exhibit A) j. Runway departure surface drawing k. Utility drawing l. Airport access plans m. Other sheets as necessary 4. Develop a Capital Improvement Plan, including a recommended phasing plan and financial overview that considers local, state, federal, and alternative funding sources; 5. Establish phased, attainable goals for airport improvements and development based on a forecast for aviation demand and current and future critical aircraft; 6. Consider the emergence of Unmanned Aircraft Systems and Advanced Air Mobility and incorporate any planning in the narrative, to include vertiport siting; 7. Develop and adopt into local zoning airport height hazard protection and airport land use compatibility measures, including associated maps, to ensure the protection of the public investment in the airport;