Specifications include, but are not limited to: DIVISION 1 - General Requirements 2 01 50 00.00 Add Mobilization / Demobilization (Including Bonds & Insurance) 1 FP $_____________ 3 01 57 13.01 Add 01 57 14.00 Add 01 57 16.00 Add 01 57 17.00 Add 01 57 23.00 Add 01 57 25.00 Add Stabilized Construction Entrance, Contractor Access Road, Reinforced Filter Fabric Barrier, Hydro-Mulch Seeding and other misc. SW3P requirements 1 FP $_____________ 4 01 50 00.00 Add Post Clearing and Grubbing Survey 1 FP $_____________ 5 01 55 26.13 Add Traffic Control and Regulation 1 FP $_____________ 6 01 57 17.00 Add Riprap (Stone Protection) (12 in) 115 CY DIVISION 2 - Existing Conditions 7 02 41 13.13 Add Demolition and Removals 1 FP DIVISION 31 - Earthwork 8 31 23 13.01 Add Clearing and Grubbing 66.0 AC $____________ $_____________ 9 31 23 13.01 Add Site Grading 28 AC $