GENERAL: 1 Lot Mobilization 3 1 Lot Special Inspections / Erosion & Sediment Control 4 1 Lot Demolition / Removals 5 1 Lot Project Cleanup, Punchlist, Demobilization & Closeout. CIVIL WORK: Duct Bank complete: Including cutting, excavation, PVC conduits, elbows, high impact spacers, traceable warning tape, concrete envelope, backfill, patching 6-A 1 Lot Duct Bank Section A-A: 3-3" PVC, 3-1" PVC, concrete encased 6-B 1 Lot Duct Bank Section B-B: 3-3" PVC, concrete encased, including LB condulets 6-C 1 Lot Duct Bank Section C-C: 3-3" PVC, concrete encased 7A 1 Lot 1" PVC/EMT from panel "P1-B100" for generaotor auxiliry power 7B 70 Linear Feet 1" PVC/EMT to generator annunciator panel 8A 1 Each Concrete pad for 'Generator' (including excavation, backfill, formwork, reinforncing, concrete) 8B 1 Each Concrete pad for 'ATS' (including excavation, backfill, formwork, reinforncing, concrete) 9 1 Each Furnish & install chain link fencing, and personnel gates around electrical equipment. ELECTRICAL WORK: 1 Each Furnish, transport, rig & install 'Generator', and accessories 11 1 Each Furnish, transport, rig & install 'ATS' 12 1 Lot Furnish, install & terminate LV power (600 volt) wiring, including all lugs 13 1 Lot Furnish, install & terminate control wiring and generator auxiliary power wiring & install (3) new 20 amp, 1 pole breakers in exisitng panel. 14 1 Lot Grounding and Bonding as per contract drawings and specifications 1 Lot Electrical Acceptance Testing as per contract drawings and specifications 16 1 Lot Start-up / Testing, Commissioning and Integrated System Testing.