RECEIPT OF BIDS: Separate sealed BIDS or Electronic Submittal using Bidnet Direct for the construction of 2025 Orem Water Reuse Pipeline Project will be received by Taggart Bowen, Acting City Engineer at the City of Orem, Engineering Division, 56 North State, Orem, UT 84057, or opened electronically on Bidnet Direct until August 14, 2024 at 3:00 p.m. and then at said office publicly opened and read aloud. The preferred method for submitting a bid is by using Bidnet Direct at bidnetdirect.com (Select the search bar > > enter “City of Orem” > Enter).
BIDDING QUESTIONS – Use Bidnet Direct to submit questions and download documents relating to bid items, specifications, and other technical questions. The project engineer is Tom Nisson, 801-229-7331. A pre-bid meeting will be held on July 31, 2024 at 2:00 p.m. at the City Center,56 North State Street, Orem, UT 84057 in the Development Services Conference Room.
OBTAINING CONTRACT DOCUMENTS: The CONTRACT DOCUMENTS may be obtained July 18, 2024 on Bidnet Direct or at the City of Orem, Engineering Division, Development Services Offices, 56 North State Street, Orem, UT 84057. There is no fee from the City to obtain the documents on Bidnet Direct. There will be a $20.00 non-refundable fee for a copy of the plans and specification. (An additional $5.00 service charge will be assessed if the plans and specifications are to be mailed).
DESCRIPTION OF WORK: The WORK will consist of construction of a reuse pipeline, but not limited to, 2,497 linear feet of PVC C-900 DR18 reuse water pipeline, 3 combination air valve manholes, 2- 8” reuse water loops, 2 – half 8” reuse water loops, 4- 8” gate valves, asphalt pavement restoration, concrete curb & gutter & sidewalk, site restoration, and other improvements. The engineer's estimate is for the work $700,000 to $800,000
SITE OF WORK: The site of the WORK is located generally at 400 South to 575 South, Sleepy Ridge Drive in Orem, UT and Vineyard, UT and Springwater Park on 1000 South, Orem, UT.