All correspondence must be made through the Vendor Portal. Specifications include, but are not limited to: the drilling of a culinary well to replace the current one which has sheared vertically and collapsed into itself at the Beryl Junction, Utah UDOT Maintenance Station Yard. EXTENT OF WORK: Construction: Mobilization Rig Up/Down Drill 10” bore hole for installation of a 6”casing. (Approximately 400’) Provide and install 6”x.250” A53 GRDB Steel blank well casing. (Approximately 200’) Provide and install 6”x.250” Steel well casing w/.250”x2.5” mill slot perforations. (Approximately 200’) Install 100’ State Certified surface seal. Provide and install gravel pack in well per CuYd (Approximately 5 CuYds) Well Development to clean out well for production. 6” well cap. 4” sub pump motor 7.5 HP 230 V 3 PH. Berk 7.5 HP 50GPM 20 stg pump end. 2” sched. 40 galv. drop pipe. (Approximately 300’). 2” Stainless Steel Couplings for drop pipe. (Approximately 15). 2” weld on pitless adaptor unit. 8 gauge 4 wire double jacketed sub pump wire flat. (Approximately 310’) Waterproof splice kit, 8 gauge 4 wire. 2” Brass check valve. (Quantity 2). Pump rig and crew hourly. Phase Technologies VFD 7.5 HP 230 V 1PH input 230 V 3 PH out. Equipment/tools: ∙The contractor is responsible for providing all equipment and tools required to complete the project. Including, ladders, lifts, drills, saw, etc...