Specifications include, but are not limited to: • Winter Sand - Supply and delivery in the fall and winter of 2021- 2022 of approximately 5,800 cubic yards of winter sand/super grit to two stockpile areas, one to the Town of Hartford Public Works Facility and the other at Quechee Wastewater Facility.; • 3/4" Crushed Gravel - Supply, at supplier's site, of approximately 200 tons of material complying with VAOT Standard Specification 704.12A.; • 1 1/2 " Crushed Gravel - Supply, at supplier's site, of approximately 200tons of material complying with VAOT Standard Specification 704.05A.; • Bank Run Gravel - Supply, at supplier's site, of approximately 200 tons of material complying with VAOT Standard Specification 704.04.; • Rip-rap - Supply, at supplier's site, of approximately 1,000 tons of material complying with VAOT Standard Specification 706.03 (Light Type).; • Supply, at supplier's site, of approximately 8,000 tons of material commonly known as "Hard Pack" or “Twin Pak”.