Specifications include, but are not limited to: • Make Ready: Adjust previously placed attachments either up or down on City owned utility poles to meet the required spacing for the new Optical Attachment • Place Fiber Optic Cable on Utility Poles: Requires drilling holes through poles, placing proper attachments, and down guying where necessary. • Placing 2 Fiber Flat and or Round cables on utility Poles • Hang four and eight port splitters • Place ground-mounted Pedestals • Place and prepare 96 port and 24 port splice enclosures • Splice Optical Cable • Where space is not acceptable, Utility Pole change-replacement/ change out is required • Place Dead-End assemblies and in-line tangents on utility poles for optical cable • Prepare Footers for 30” X 24” X 36” Pad • Trench / Plow / Bore underground Cabling • Place the telecommunications cabinet on the Pad mentioned above • Secure Electrical Permits Inspections etc. for the above cabinet • Secure proper lane closure and signage required by the City