Site 1 – Powhatan WMA SOW 255: A schematic of the existing well depicting the location of the bottom of steel surface casing and the minimally productive interval of wellbore is shown in figure 3. The well is an open borehole equipped with a locking well cap - no pump is installed. Site 2 – Rockingham County Bus Lot SOW 261: The well is completed at a school bus maintenance and storage facility. The well is an open borehole equipped with a locking well cap - no pump is installed. General Requirements – at minimum, the Contractor shall: a. Provide all applicable labor, supervision, water, equipment, tools, parts, materials, supplies, incidentals, freight (F.O.B. Destination, to the job Site), travel (to and from the job site), etc., necessary to perform the hydraulic fracturing services as specified herein. b. Perform all collection and recycling services in accordance with all applicable local, state and federal laws and regulations, to include, but not limited to: (1) Occupational Safety and Health Administration (OSHA) standards. c. Coordinate all hydraulic fracturing services with the DEQ Geologist: