The Project is located in Patrick County, Virginia, and involves construction a four-lane divided roadway, of which portions are anticipated to be on a new alignment. The limits of the Project are from approximately 0.1 miles west of Route 795 (Mabry Mill Road) to approximately 0.51 miles East of Route 610 East Intersection (Cloudbreak Road), for a total length of approximately 4.5 miles. The existing bridge over the Dan River will be replaced as part of the project. The work includes but not limited to: roadway, structure and bridge, survey, environmental, geotechnical, hydraulics and drainage, traffic control devices, transportation management plan, right-of-way, utilities, public involvement/relations, quality assurance and quality control, construction engineering and inspection, and overall project management.