It is the intent of this Contract is to secure services to remove the existing natural gas generator and transfer switch from the project site and install a new natural gas generator and transfer switch. Work shall include all associated demolition rigging, piping, equipment, electrical equipment, controls, insulation, patching, painting and related work as detailed in these specifications to provide a complete and fully operational installation. As the current generator is inoperable, the Contractor shall furnish and install a backup temporary generator with cabling, control wires to the school emergency electrical system while the generator project is in transition. The temporary generator and cabling will be removed upon project completion. All temporary building penetrations shall be repaired by the Contractor. The area around the portable and existing generator shall be enclosed in a temporary fence.